The table refers to the example of wiring shown in the ABACUS model manual for swing motors.
NOTE: If the cables are of a different length than those shown in the table, the section of the cables must be determined based on the actual absorption
of the connected devices.
The requirements are reported in the EN 50575: 2014 standard:
With the publication of the standard EN 50575, in the list of harmonized standards for Regulation CPR 305/2011, Com. 2016 / C 209/03, also electric
cables, already subject to CE marking for the Low Voltage Directive 2014/35 / EU, must be CE marked also under the CPR Regulation.
In the eventualities of connections with devices connected in parallel on the same power supply line, the sizing of the cables shown in Table 1 must be
re-evaluated on the basis of the absorptions and the actual distances.