Corghi A 2030 Manual De Uso página 95

Ocultar thumbs Ver también para A 2030:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

- Insert pin E into hole F and into the U-bolt
F1 of the pole tilting cylinder, and fasten
with circlip M.
- Connect hose G to the intermediate union
connected to the pole lifting valve H.
- Fit the hose connector of tank 2 into hose
Q, fasten the tank 2 to the machine with
nuts and washers R, and tighten the clamp
O onto the hose Q (T.I. version only).
- Open the bead breaking arm Z.
- Fit the spacer drift U on the bead breaking
cylinder pin V, close the bead breaking arm
by letting the just mentioned pin through
the swinging block.
- The nut T is to be screwed on the bead
breaking cylinder pin V only when the
machine will be installed and connected
to the pneumatic supply line. Tighten the
nut T until P is 3-4 mm.
- Fit the pole guard I and lock it with screws and washers L.
- Fit the side cover.
I
L
A 2030 - A 2025 - A 2022 - A 2018 - A 224 A - A 224 Operator's manual
B
D
G
H
V
U
Z
P
C
E
M
F
A
D
F1
O
Q
1
T
R
EN
2
95

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

A 2025A 2022A 2018A 224 aA 224

Tabla de contenido