Electric Heating 2 Kw (Additional Equipment); Run Test And Water-Tightness Test - HOESCH Whirlsystem Deluxe Instrucciones De Montaje

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 80

02.05.4 Electric heating 2 kW (additional equipment)

Electrical 2kW water heater starts automatically when the water jet is on. Water temperature is kept at constant level of
about 37°C.
In case of a version with integrated electric heating 2 kW the system is factory-equipped with an electric part and control
components. In such a situation a separate electric connection should be made for part of the heating power and it
should be protected separately 10 A.
Ensure polarity according to the connections diagram. Connection to the power supply system and operation
of the system only with the protection cable and connected equalizing of potentials. The power supply
connection of the system control unit and for part of the heating power should be protected with a common
current trip device 30mA.
L
N
4
L
N
GB
03

Run test and water-tightness test

Once you take steps described at point 02, please proceed with the test run. For this purpose clean the bathtub, fi ll it
with water (temperature 40 +/- 5˚C) until overfl ow level and then turn on whirl massage for 10 min. During this, please
monitor max. and min. speed. Then, turn off the whirl system for 15 min. After one hour, check water-tightness of pipes
and connectors. During next test run a disinfection must be done according to point 14.
30
1
L1
N5
PE
N6
L2
PE
PE
3
PE
16 A
16 A
RCD 30mA
2
L
PE
N
5
230 V~ 50 Hz
L
N
PE
1 - connection clamps
2 - steering
3 - heater
4 connecting socket - temperature fuse
5 - PI 65 connection box
(to install by the construction team)

Publicidad

Tabla de contenido
loading

Productos relacionados para HOESCH Whirlsystem Deluxe

Tabla de contenido