5
Work environment conditions
- Relative humidity: from 30% to 95% without condensation.
- Temperature range: from 0°C to 40°C.
UK
INSTALLATION
After unpacking, position the parts ready for assembly. During the handling phase, neces-
sary to find the right positioning of the lift on the ground, suitable slings or chains must
be used (fig. 6).
Once the exact position of the lift has been established place the control unit. The stand-
ard positioning is the one shown in figure 7, with the control unit on the left of the lift
and its control panel oriented on the other side of the lift. This will allow the operator a
good view of the whole working area.
The positioning distances are shown in figure 7, assuming as reference the front left
corner of the runway.
Operator's manual ERCO X5000 CT LT PT2 FAST
57