To make the connections between the lift and the control unit, proceed as follows:
1. Remove the control unit door by unscrewing the 4 fixing screws.
2. Extract the hydraulic pipes under the main lift runways.
3. Remove the hydraulic plugs from the hydraulic control unit unions.
4. Connect the pipes to the hydraulic control unit ensuring that the numbers on the
pipes match the ones indicated in figure 8. Be careful to the tightening.
5. Connect the fluid recovery pipes R to the unions on the tank, as shown in (figure
8_1).
N.B.: When all the pipes R have been connected, turn on the cock A fig.8_1.
8
60
Hydraulic system connection
2
5
2
6
5
Operator's manual ERCO X5000 CT LT PT2 FAST
6
1
3
4