Preparatory work when using precision tubes (Figures
5.d
5.e
5.f
Attaching the roller cap ( Figure )
1.
Push the roller cap (4) into the winding shaft (5) and then put the ball
bearing (2) onto the axle (3).
50
STOP
-
3.
Push the tubular motor into the precision tube.
4.
Mark four fixing holes and drill these through the precision tube into
the driver.
CAUTION
◆ Never drill deeper than 10 mm into the driver.
◆ Never drill close to the drive as this will cause it to malfunction.
5.
Screw fix or rivet the precision tube to the driver..
..using self-tapping screws or four blind rivets.
)
EN