Descargar Imprimir esta página

Packing, Transport And Storage; Lifting And Handling - Corghi ERCO 500 Manual De Uso

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

3 CHAPTER 3 - PACKING, TRANSPORT AND STORAGE
Only skilled personnel who are familiar with the lift and this manual shall be allowed to carry out
packing, lifting, handling, transport and unpacking operations.
3.1
PACKING
The lift is delivered in many components that appears sub-assembled.
The lay-out is referred to the model.
The model on-floor installation :
 No. 2 base units, each one with a platform and hydraulic cylinders
 No. 1 control box equipped with hydraulic unit
 No. 1 box containing hydraulic lines, connecting cables, four rubber blocks, stickers and
technical documentation
 No. 4 drive-on ramps (2 front and 2 rear ramps) equipped with protective devices to
connect platforms
The model in-ground installation:
 No. 2 base units, each one with a platform and hydraulic cylinders
 No. 1 control box equipped with hydraulic unit
 No. 1 box containing hydraulic lines, connection cables, four rubber brackets, 40 mm high,
stickers and technical documentation
 No. 2 holes covers
If requested, optional accessories are available to satisfy each customer's requirements (Ref.
accessories manual and price lists).
The lift is packed in a single box on a wooden bed, wrapped up in non-scratch waterproof material
and sealed with 2 straps.
The average of the package is 520 kg
3.2

LIFTING AND HANDLING

When loading/unloading or transporting the equipment to the site, be sure to use suitable loading
(e.g. cranes, trucks) and hoisting means. Be sure also to hoist and transport the components
securely so that they cannot drop, taking into consideration the package's size, weight and centre
of gravity and it's fragile parts.
Figure 1 – PACKAGE AND HANDLING
Hoist and handle only one package at a time
45

Hide quick links:

Publicidad

loading

Este manual también es adecuado para:

Erco 500fErco 505Erco 505f