7 OPERATING FLUSHING PROGRAM
7.1
Regular functions of the A/C service station
For all functions which are not related to the flushing process, please refer to the original
operating manual of the unit.
7.2
A/C service station preparation
Once the unit has been moved close to the air-conditioning system or the component to be
flushed, it should rest on all four wheels on a horizontal surface in order to ensure proper
functioning of the scale.
It should then be connected to the mains supply as indicated on the unit's identity label next to
the Main Switch, especially with regards to the voltage and applicable power.
Before starting the flushing, it is necessary to remind that all refrigerant have been
initially recovered from the system or the components to be flushed.
The A/C service station and the flushing kit have been connected to the considerate
system or components as indicated in section "6 FLUSHING METHOD WITH ACKF01
KIT" of this manual.
7.3
Start-up
Move the Main Switch to the ON position I (ON).
When the unit is switched on, the Display shows the following information for a few seconds.
W A I T . . . ■
At the end, the unit goes then in stand-by mode.
R e f r i g e r a n t
P A G
U V
A d d i t i v e
D D / M M / Y Y
(Here is in example stand-by display of ECK650E and ECK670E)
DATE
ACKF01_GB_00
O i l
WARNING:
g . X X X X X
c c . X X X X
c c . X X X X
H H : M M : S S
TEXA S.p.A.
TIME
102/122