Pneumatic Hook Up; Electric Hook Up; Fixing To The Ground - Nussbaum TC 355 Manual De Instrucciones

Ocultar thumbs Ver también para TC 355:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

N.B.: Keep the packing material out of the reach of children as it can be a source of danger.
Take the packing materials to an appropriate solid waste disposal pick up point if they are polluting or non-biodegradable.

6.3 PNEUMATIC HOOK UP

For correct pneumatic hook-up, proceed as follows:
1) Lower the pedal (5, Fig. L) all the way down to avoid sudden opening of
the clamps.
2) Connect the machine to a compressed air supply (with recommended operat-
ing pressure of 8 - 10 bar) by means of the coupling (30, Fig. E) supplied as
standard, using a 7 – 8 mm (internal Ø) rubber hose for compressed air.
WARNING!
The compressed air pressure must not exceed 16 Bar.
3) A connection (31, Fig. E2) is available on the back of the tyre changer to
fit an inflation gun.
WARNING!
Use the union (31, Fig. E2) only for the outlet of air
(to connect inflating device).
Do not connect the compressed air network to this
union: you could break the pneumatic equipment and
the safety devices.
Before making any electric hook up, check to be certain that the mains voltage corresponds to what is stamped on the voltage tag
(attached on the feeding cable of the tyre changer).
It is absolutely essential that the system is equipped with a good grounding circuit.
The machine must be connected to a power supply line circuit breaker set for 30mA.
Note the required power draw as highlighted on the tag-plate fixed to the back of the tyre changer.
Check to make sure the shop electric wiring circuit is dimensioned sufficiently to carry this.
WARNING!
Work on the electric system, even if minor, must be done exclusively by professionally qualified personnel.
Manufacturer shall not be liable for any injury to personsor damage to things caused by failure to comply with
these regulations and can cancel warranty coverage.
1- Prepare the following tools: N. 1 - Hex spanner 13; N. 1 - Electric drill; N. 1 - Concrete drill bit diam. 13 long; N. 4 - Metal expansion screw
anchors 13x50; N. 4 - M 8 x 50 anchor screws.
2- Drill four holes in the floor corresponding to the holes pre-drilled in the base. Holes should be 80 mm deep. Use the long, 13 mm concrete
drill bit.
3- Insert the expansion plugs and tighten with the 13 mm spanner.
TC 355 - Liga C 253

6.4 ELECTRIC HOOK UP

6.5 FIXING TO THE GROUND

24
ENGLISH • Instructions manual
30
E
31
E2

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Liga c 253

Tabla de contenido