GUTMANN CAPA Instrucciones De Montaje página 35

Ocultar thumbs Ver también para CAPA:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 41
1. The extractor hood must be carefully
removed from the packaging by 2 peo-
ple and placed on the mounting lift.
Then prepare the installation location on
the ceiling. To achieve optimum extrac-
tion capacity, the hood must be posi-
tioned in the middle above the cooking
hob. Use a plumb line to mark the cen-
tre of the hood on the ceiling.
2. Take the installation frame (A) to
transfer the fastening holes for the ex-
tractor hood (2 and C) and for the
mounting frame (1 and A) onto the ceil-
ing.
3. Drill the suspension holes in the ceil-
ing and use suitable dowels for the wall
material.
4. Align the mounting frame (1 and A)
screw it tightly onto the ceiling.
Now screw in the bolts for mounting the
hood (2 and C) until they protrude 2-
4mm from the ceiling.
en
35

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

07 em0701 emCapa

Tabla de contenido