4. INSTALL THE TRANSpORTATION pLATFORM:
Two persons will be necessary to have the machine properly installed.
1.
Slide the table drive shaft (at the back of the conveyor table) into the hub.
Use some force to press the
2.
Put the other side of the conveyor table (at the front) with the wedge into the
notch of the drive shaft. The wedge can be put into the right position to the
notch by turning the conveyor belt.
3.
Have the table rest on the supporting frame that is to be fixed on the
machine's frame.

5. ELECTRIC CONNECTION

6. COMMISSIONING
After connecting the power supply, please use the manual lever or footboard
switch to ensure operation is ok.
6.1. Check the tension degree of conveyor belts:
If the conveyor belt is not tight enough, there will be a slip during rolling dough.
If the conveyor belt is too tight, it will result in machine abrasion. If one side of
the belt is tighter than the other, the belt will move to the side which is looser
than the other, the tension of the looser one has to be increased.
4
spring.
5.1.
Connect the electric cables to the machine with a circuit
breaker which is about 1.5m high from the ground.
5.2.
Connect the right power supply according to the indication
on the machine nameplate.
5.3.
The machine must have ground protection.