Installation Of The Positive Suction Head - Pentair STA-RITE CPS3-10 Serie Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 93

8.3 INSTALLATION OF THE POSITIVE SUCTION HEAD

1) Basin or tank
2) Float
3) Shut-off valve
4) Outlet tubing
For the installation of the positive suction head, ensure the correct inclination of the suction piping until the air present in the tubing
can exit the outlet tubing.
5) Tank/autoclave membrane (8 l/min)
6) Gauge
7) Pressure transducer
8) Flexible tube
9) Non return valve
10) Filter
11) Motor pump complete with inverter
EN
43

Publicidad

Tabla de contenido
loading

Tabla de contenido