Descargar Imprimir esta página

Key Automation ALT 4 Manual De Instrucciones página 11

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 26
PREPARATION FOR AUTOMATION OF THE BASE
1. Provide a foundation pit and arrange one or more conduits for the passage of the electrical cabling.
2. Assemble the 4 anchoring brackets on the mounting plate and fasten with the 4 bolts provided.
3. Pour the concrete into the inside of the pit and position the base plate.
NOTE: verify that the plate is perfectly leveled and parallel to the opening barrier.
4. Wait for the complete setting of the concrete.
5. Unscrew the 4 nuts that hold the base joined to the anchoring brackets and position the rack on
the plate.
mounting plate-BR
mounting plate-BR6
11

Publicidad

loading

Este manual también es adecuado para:

Alt 6Alt 4kAlt 6k