Electric Fitting: Machine With Motor - JF 2D Manual Técnico De Operación

Tabla de contenido

Publicidad

4.2- Electric fitting: Machine with motor

The electric wire (1) must be connected to the circuit
breaker or fuse box before to switch it to the plug.
See the guidances below:
Network tension
Circuit breaker
220 Volts
20 Amperes
110 Volts
30 Amperes
NOTE: JF 2D can be equipped with 2 or 3 hp (IP 21, IP
55). The motor leaves the factory set up to operate in
220 volts, according the label (2) attached to the cord.
If your network to become 110 volts, the electrician
must changes the electric motor wiring, according to
the motor nameplate.
Attention:
Contract a good electrician to perform
the electric fitting, in order to assure the
safety and equipment correct operation.
12
2
1
MANUAL TÉCNICO DE OPERACIÓN - MOLINO JF 2D
Procedimiento:
a) Quite la boquilla de alimentación (2) aflojando los tres
tornillos (3).
b) Afloje la cerradura (4) y levante la tapa (5).
c) Quite la tapa (6).
d) Quite el pasador (7) de cada uno de los pernos (8).
e) Empuje los pernos (8) hacia atrás y retírelos por la
apertura de montaje de la boquilla (2), con cuidado para
no dejar caer los martillos (1) y espaciadores (9).
f) Tratándose del primer cambio de posición de los
martillos, use ahora el lado desintegrador B de los
mismos (vea la página anterior).
Para ello, introduzca los pernos (8) por la apertura de
montaje de la boquilla (2) y monte los espaciadores (9)
y martillos (1) de forma alternada, exactamente como
en la figura al lado.
g) Muy importante: Instale un pasador doble (7)
nuevo en cada uno de los pernos (8).
h) Vuelva a instalar la tapa (6).
I) Cierre la tapa (5) y trábela con la cerradura (4).
j) Vuelva a instalar la boquilla de alimentación (2).
3
2
5
4
6
9
8
7
1
27

Publicidad

Tabla de contenido
loading

Productos relacionados para JF 2D

Tabla de contenido