Assembly of the Transition:
The supplied transition mounts to the top or rear of the
hood depending on the discharge direction.
10" (254mm)
Duct
Sheet metal screw
location (x2)
5
3
"
/
16
(84mm)
1. A minimum height clearance of 6" (152mm) is needed
above the hood for transition mounting.
2. Align mounting holes at base of transition with the
mounting holes of the 1/2" (13mm) flange located at
the top or rear of the hood, depending on direction of
discharge (see Figure 2 on page 5).
3. Fasten transition to hood using (2) sheet metal screws
included with hood (see Figure 3 and Figure 4).
4. Seal connection between transition and hood with
aluminum tape.
5. Remove tape holding damper closed.
See Figure 1 on page 1 for overall hood dimensions.
English 6
1
17
" (445mm)
/
2
Figure 4: Transition Connection
Wall Mount Installation
6" (152mm)
Duct Cover
Figure 5 shows a typical installation of the hood with a duct
cover. Accessory 6" (152mm) and/or 12" (305mm) duct
covers are used to fill the space between the hood and
ceiling (available for purchase separately).
The installation height ranges from a minimum height of 30"
(762mm) to a maximum height of 40" (1016mm); however,
it is necessary to follow the cooking appliance manufac-
turer's installation instructions for proper hood height. In
Figure 5 one 6" (152mm) duct cover has been used in this
installation. Add or subtract duct covers as appropriate to
accommodate ceiling height and recommended hood
height. The duct cover structure is supported by the hood.
NOTICE:
The hood could incur some damage from heat if a
Professional Series Range or Cooktop is operated with
multiple burners at high settings under a hood that is
installed at minimum clearances.
24"
(610mm)
18"
(457mm)
Hood Mounting Heights
Min 30" (762mm)
Max 40" (1016mm)
Note:
Follow cooking
appliance
manufacturer's
recommendations
Figure 5: Typical Hood Installation