Step 14. Final Installation Checklist - Samsung NY58J9850WS Usuario, Manual De Instalación

Estufa de combustible dual
Ocultar thumbs Ver también para NY58J9850WS:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation instructions
Checking the flame quality:
All combustion flames need to be visually checked to determine their flame quality.

Step 14. Final installation checklist

You have just completed installing your range. Make sure all controls are in the off position
and the flow of ventilation air to the range is unobstructed. The following is a checklist to
confirm your range is safely installed and ready for operation.
Gas line has been properly connected to the range. The gas has been turned on. All
connections have been checked for leaks.
Range is plugged into the properly grounded electrical receptacle.
Approved anti-tip bracket is properly installed and engaged with the range.
Range is leveled and is firmly sitting on a solid, level floor.
Gas surface burners have been properly assembled.
All burners have been tested for proper operation.
44 English
1. Soft blue flames—Normal for natural gas
operation.
1
2. Yellow tips on outer cones—Normal for LP
gas operation.
3. Yellow flames—Abnormal for any gas
2
operation; call for service.
NOTE
If burner flame looks like 3, the range
3
should not be used until it is serviced. Call
for service. Normal burner flames shall look
like 1 or 2, depending on the gas type you
use.

Publicidad

Tabla de contenido
loading

Tabla de contenido