Internal Sealing Of Both Enclosure Types - Mettler Toledo IND560 PDX Guia De Instalacion

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

IND560 PDX Installation Manual
Sealing wire
threaded through
Sealing wire
threaded through
plastic seal

Internal Sealing of Both Enclosure Types

Both the panel-mount and harsh enclosures are sealed the same way when sealed
internally. Follow the procedures described below.
Main PCB Switch Sealing
1. Ensure that the appropriate approval region has been selected in setup under
Scale, Type, Approval and that the Metrology security switch SW1-1 is in the
"on" position.
2. On the panel-mount terminal, remove AC power and remove the main board to
apply the internal seal. This step is not necessary for the harsh enclosure.
3. Attach the plastic bottom sealing plate to the Main board as shown in Figure
Figure 2-68.
2-40
clip
Figure 2-67: Harsh Enclosure Seal Threaded and Ready to be Closed
Figure 2-68: Attaching the Plastic Bottom Sealing Plate

Publicidad

Tabla de contenido
loading

Tabla de contenido