Starting And Using The Machine - Dalla Corte EVO2 Manual De Usuario

Ocultar thumbs Ver también para EVO2:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

Starting and using the machine

Follow the instructions below with the help of the
scheme in Pic.1.
• Turn on the water supply tap (
• Turn on the ON/OFF electric supply switch (
1
Pic.
) and turn the machine switch clockwise (
Pic.2); make sure the display turns on.
• As soon as the machine has been turned on, the
automatic auto-fill function starts filling the boiler
until the right level is reached; during this stage,
the
symbol blinks on the display.
• Once the filling phase is over, groups start heating
up and the pre-set values in group temperature bo-
xes start blinking.
NOTE
This heating sequence takes place only when the machine is switched on after it has been
switched off completely with the main switch (
not to require too much energy, thus avoiding problems of electrical system overload
in the place of installation.
42
• At the end of the heating phase, values in group
temperature boxes stop blinking.
1
Pic.1).
• Immediately afterwards, the boiler heating phase
7
starts, during which the value in the boiler tempe-
1
rature box blinks.
• During boiler heating up, groups can already be
used.
• As soon as boiler reaches its set temperature,
the set value in the boiler temperature box stops
blinking and the machine bleeps twice to inform
the whole machine is ready for use.
1
Pic.2). This sequence allows the heating up phase

Hide quick links:

Publicidad

Tabla de contenido
loading

Tabla de contenido