Scope Of Delivery - SMA SUNNY BOY STORAGE 3.8-US Instrucciones De Instalación

Ocultar thumbs Ver también para SUNNY BOY STORAGE 3.8-US:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

SMA Solar Technology AG
3

Scope of Delivery

A
Figure 1 : Components included in the scope of delivery
Position
Quantity
A
1
B
1
C
1
D
1
E
1
F
1
G
1
H
4
I
1
J
5
K
5
L
5
M
5
N
1
O
1
Installation Manual
B
C
T O P
H
N
Designation
Inverter
Wall mounting bracket
Cylindrical screw M5 x 60
Installation manual, production test report, supplementary sheet with
the default settings
4-pole terminal block for connecting a RS485 energy meter
Terminal block for the AC connection
Terminal block for connecting the outlet for secure power supply op-
eration
6-pole terminal block for connecting the battery communication ca-
bles and the communication cable of the automatic transfer switch
2-pole terminal block for the switch connection for secure power
supply operation or for black start feature.
Clamping bracket
Cylindrical screw M5 x 16
Washer M5
Spring washer M5
Ferrite
Cable tie
D
E
J
I
K
O
SBSxx-US-10-IA-xx-12
3 Scope of Delivery
F
G
L
M
13

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Sunny boy storage 5.0-usSunny boy storage 6.0-us

Tabla de contenido