SMA SUNNY BOY STORAGE 3.8-US Instrucciones De Instalación página 41

Ocultar thumbs Ver también para SUNNY BOY STORAGE 3.8-US:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

SMA Solar Technology AG
5. Unlock the terminal points of the 4-pole terminal
block.
6. Connect the conductors of the RS485
communication cables to a 4-pole terminal block. To
this end, insert the conductors into the terminal
points and unlock the terminal points by pressing the
lever down. Observe the terminal block assignment.
7. Ensure that the conductors are plugged into the terminal points tightly by pulling slightly on the
conductors.
8. Insert the 4-pole terminal block for the
communication connection into the jack BATx on the
battery interface module.
9. Press the RS485 communication cable with cable
shield into the shield clamp on the busbar below the
communication assembly.
10. Connect the RS485 cable to the energy meter (see energy meter manual).
Installation Manual
6 Electrical Connection
2
1
SBSxx-US-10-IA-xx-12
41

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Sunny boy storage 5.0-usSunny boy storage 6.0-us

Tabla de contenido