7
MAINTENANCE
MAINTENANCE PANEL EQUIPMENT
Use the following table to know the peridicity of maintenance.
CHECK
CLEANING
SCREW
PULLEYS
LOCK PIN
TENSIONES
STEEL CABLE
the equipment and make the
immediate cable replacement.
SELECTOR PIN
use the pin and make the
SHROUD
COUNTER
UPHOLSTERY
ADJUSTIMENTS
Any queries can be made about damages to the customer service center, by calling 0800-7724080. To find an Authorized dealer go to
http://movement.com.br/assistencia-tecnica and allow the browser to access your location and facilitate to a nearest authorized person.
Model____________________________
Serial Number_________________________
DAILY
Always clean the
equipment before and
after each workout.
Check that the pins are not
Check that the cables
steel are not
damaged. Case
are, do not use
If the selector pin
is damaged, do not
immediate exchange of
the part.
Invoice date______________________________
Copy or original of the invoice (in case of Warranty)_______________________
WEEKLY
Retighten the screws
if the parts are
loose.
heck that the pulleys
are not damaged
or worn out. Case
are out of your way
make the switch.
are damaged or
worn out. Case
are out of your way
make the switch.
steel as described in this manual.
Check that the fairing
it is not damaged. Case
be making the switch
immediate part.
49
MONTHLY
Always check and do the
cable tensioning
Check that the settings
are tting
perfectly. If not,
contact
an authorized point for
exchange the part.
WHEN NEEDED
Change the battery of the
counter.
Change the upholstery
if it is torn.