EASY INSTALLATION KIT FOR A FIREPLACE WITH AN ALREADY
INSTALLED COVERING
fig. 1
1st step (Figs. 1-2)
- Enter a steel flue into the old masonry chimney flue and apply the smoke channel (A) to its base, so as to connect it to
the INPELLET 54 smoke outlet (this will be misaligned).
- Install the support plate (B), which will have an insert, and fasten it into its definite position with dowels.
- Position the centring bracket (C) of the smoke channel (A) and fasten it with the bolts supplied.
- Fit the smoke channel onto the collar (D) of the bracket (C) by resting it onto the screw (
mat
G
steel rod
B
fig. 3
2nd step (Fig. 3-4)
- Wrap the flue or smoke channel with a mat, (G) made of a number of ceramic fibre layers or equivalent material,
which is thick enough to fill the gaps formed between the new steel flue and that made of masonry.
- For greater safety and ease of installation, remove the outer frame with the grille, removing the top pin on the left
(E) and pulling it upwards.
- Place the inert into the centre of the support plate (B) (fig. no.1) and push it until it reaches the end-of-travel.
*
H
fig. 5
INSTALLATION
(consisting of plate "B" and bracket "C" - fig. 1)
A
C
B
F
25
*
B
fig. 2
E
fig. 4
3nd step (Fig. 5)
Through the opening (H) set on top of the insert, remove
*
the support screw (
) and fit the smoke channel onto the
smoke outlet (F), blocking it in place with the screw (
and sealing with high temperature mastic.
- At this point, replace the outer frame with the grille.
A
C
D
*
fig. no.2).
*
)