FIG.13
Step 2
Step 1
Step 4
Step 1
• Rest the ends of heat plates & searing burner cover
into notches inside casting as shown.
Step 2
• Install Smoker on hooks inside cover assembly.
Step 3
• Install 4 grids as shown.
Step 4
• Install warming rack into supports as shown.
Step 5
• Install upper grill divider as shown. Use
when 2 cooking zones are required
Step 6
• Install AA BATTERY into ignitor,
put - (negative) side of battery in first.
GRILL ASSEMBLY
!
CAUTION
Step 6
BEFORE OPERATING YOUR NEW OUTDOOR GAS
BARBECUE/GRILL WITH iQue CONTROLLER
!
MAKE SURE YOU READ AND UNDERSTAND THIS
OPERATION MANUAL COMPLETELY AND ENSURE
DANGER
THAT YOU CAREFULLY READ AND FOLLOW THE
INSTRUCTIONS FOUND IN THE IQUE
INSTRUCTION MANUAL - USER GUIDE.
37
SOME PARTS MAY HAVE SHARP EDGES
OR BURRS. HANDLE WITH CARE.
Step 5
IGNITOR
CAP
BATTERY
Put - (negative) side of battery in first
Step 3