Descargar Imprimir esta página

Fire Prevention - Fronius Symo Serie Manual De Instrucciones

Ocultar thumbs Ver también para Symo Serie:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 9
NOTE! If the cable insulation of the AC cable is not designed for a maximum of 1000 V, AC and DC
cables must not be crossed when connecting in the inverter.
If crossing the cables during connection is unavoidable, the AC cable must be laid in one piece of the
protective hose supplied with the inverter.
AC and DC cables can only be laid together if the insulation on both cables is designed for the max.
possible voltage of 1000 V.

Fire prevention

CAUTION! Risk of damage to inverters and other live photovoltaic system components due to poor or
unprofessional installation.
Poor or unprofessional installation can cause overheating of cables and terminal connections and result
in arcs. These can cause heat damage, which in turn may lead to fires.
Observe the following when connecting AC and DC cables:
-
Tighten all terminals to the torque specified in the operating instructions
-
Tighten all grounding terminals (PE / GND), including free ones,
to the torque specified in the operating instructions
-
Do not overload cables
-
Check cables for damage and verify that they are laid correctly
-
Take note of the safety instructions, operating instructions and
any local connection regulations
Using fastening screws, always screw the inverter firmly to the wall
bracket to the torque specified in the operating instructions.
Ensure that the fastening screws are tight before starting the inver-
ter!
Observe the manufacturer's connection, installation and operating instructions at all times. To reduce the hazard
potential to a minimum, perform all installation and connection work carefully according to the instructions and
regulations.
Refer to the device operating instructions / installation instructions for the tightening torques to be used at the
relevant terminal connections.
Fronius manufac-
Detailed, country-specific warranty terms are available on the internet:
turer's warranty
www.fronius.com/solar/warranty
To obtain the full warranty period for your newly installed Fronius inverter or storage sys-
tem, please register at: www.solarweb.com.
6
2
2.5 Nm

Publicidad

loading