Mosa GE 6000 SX/GS Manual Del Usuario página 56

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

© MOSA
1.0-09/05
Maintenance operations on the electricity-generating group prearranged for automatic operation must be
carried out with the panel in RESET mode.
Maintenance operations on the installation's electrical panels must be carried out in complete safety by cutting
off all external power sources: ELECTRICAL POWER, GROUP and BATTERY.
For the electricity-generating groups prearranged for automatic operation, in addition to carrying out all periodic
maintenance operations foreseen for normal usage, various operations must be carried out that are necessary in
relation to the specific type of use. The electricity-generating group in fact must be continuously prepared for
operation, even after prolonged periods of inactivity.
1. TEST or AUTOMATIC TEST cycle to
keep the generating set constantly
operative
2. Check all levels: engine oil, fuel
level,
battery
electrolyte,,
necessary top it up.
3.
Control of electrical connections and
cleaning of control panel
Carry out
motor oil change at least once a year, even if the requested number of hours has not been
attained.
MAINTENANCE
!
ATTENTION
MAINTENANCE GENERATING SET WITH AUTOMATIC BOARD
NO-LOAD
if
EVERY MONTH
EVERY
AND/OR AFTER
WEEK
INTERVENTION ON
X
X
GE
LOAD
WITH LOAD
X
X
X
M
43.1
EVERY YEAR
X

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ge 6500 sx/gs

Tabla de contenido