Index
< REFERENCE ITEMS>
Confirming type specification
1. Installation/mounting
2. Wiring
Power on
3. Usages
4. Display and operation
5 Setting method of temperature
and parameters
6. Functions
7. Setting of input type
and control algorithm.
Operation
8. Error indications
(Note) *To start the operation, wait for about 30 minutes after the power-on for warm up.
*Note
<DESCRIPTION>
• Confirming that the delivered controller is
equal to the ordered one.
• Outline dimensions
• Panel cutout dimensions
• Mounting method on the panel
• Terminal connection diagram
• Set value change method
• Basic operation method
• List of parameters
• List of input/output/alarm codes
• Setting of input type and ranges
• Selecting of control method
8