Descargar Imprimir esta página

Scope Of Supply; Installation And Operating Instructions - Wilo Fluidcontrol Instrucciones De Instalación Y Funcionamiento

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 30
The green diode (pos. 10) indicates normal pump operation.
The switch unit contains the electronic as well as the terminal block for power
supply and pump motor. The signal/operating elements at the switchbox cover
are (Fig. 2)
Yellow LED: Mains power is on, the pump is on ready standby, (pos. 9)
Green LED: Pump runs, (pos. 10)
Red LED:
Reset button: After fault rectification the reset button (pos. 8) must be kept
pushed until the system is fully pressurized. This is also valid for renewed
start-up, otherwise the pump will again fail due to insufficient system
pressure.

4.2 Scope of Supply

Wilo-Fluidcontrol (EK-series + integrated socket + 1.5 m connecting
cable).

Installation and Operating Instructions.

5
Siting/Installation
5.1 Installation
For installation and mounting requirements refer to the pump installation and
operating instructions.
The arrow at the housing indicates direction of flow.
The WILO-Fluidcontrol must only be mounted into a vertically run discharge
pipe.
The WILO-Fluidcontrol to be screwed onto the discharge port of the pump
using
suitable connecting fittings, to be sealed with hemp or Teflon band.
If the water column between pump and highest outlet tap exceeds 15 m,
the unit must be installed at a higher level in the discharge pipe ensuring
a maximum vertical head onto the unit of not more than 15 m. In such
case no outlet tap must be located at a level below that of the WILO-
Fluidcontrol (Fig. 3).
In order to avoid noise transmission from the pump onto the pipe system
it is recommended to provide and install a flexible connector at the
discharge side of theWILO-Fluidcontrol.
Any
fault
leading
pipe system, (pos. 11)
to
pressure
ENGLISH
loss
in
the
15 (55)

Hide quick links:

Publicidad

loading

Este manual también es adecuado para:

Fluidcontrol-ek