Adjusting the flow of the protective gas.
During operation, the protective gas flow in the
furnace must establish as indicated.
1
Fig. 37
1 Gas flow directly after starting
2 Gas flow during the cooling phase
To ensure proper flow, the output pressure at the
gas cylinder during operation must be 1 bar.
When the value strongly deviates after starting:
▷ Readjust the operating pressure to 1 bar during
operation (see figure 36).

6.2.3 Post-preparations for the Sintering

When the sintering program is over, a tempera-
ture of 50 °C is indicated and the compressed-air
cooling is stopped.
▷ Switch the furnace off.
▷ Using the bowl/cover tongs, carefully remove
the protective-gas retort out of the furnace
compartment and place it down on a non-flam-
mable surface.
NOTE:
Tilting off or falling down of the sintering bowl,
due to its high weight.
▷ Apply bowl/cover tongs ensuring a firm and
good grip.
A P P L I C A T I O N A N D O P E R A T I O N
▷ Using the bowl/cover tongs, carefully remove
the sintering bowl out of the furnace compart-
ment and place it down on a non-flammable sur-
face.
▷ Remove the sintering cover and place it down
on a non-flammable surface.
▷ Remove the sintered frame.
Before continuing:
▷ Blast off the sintered frame with commercially
available aluminium corundum (50 - 110 μm).
▷ Evaluate the sintering result with the Sintron
sintering chart.
2
6.3

Finalizing the Sintering Program

When the sintering program is over, a tempera-
ture of 50 °C is indicated and the compressed-air
cooling is stopped.
▷ Switch the furnace off.
▷ Shut the main valve of the gas cylinder.
▷ When not using for longer periods, leave the sin-
tering-compartment components in the fur-
nace.