Descargar Imprimir esta página

Test Running - Zibro S30 Serie Manual De Instalación

Ocultar thumbs Ver también para S30 Serie:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 22

TEST RUNNING

Perform test running after completing electrical safety check and gas leak check.
The test running time should last more than 30 minutes.
1.
Open the panel and lift the panel up to an angle which remains fixed. Do not lift the panel any fur-
ther when it stops with a click sound.
2.
Press the manual control button twice until the operating indicator lights up, the unit will operate
on Forced Cool mode.
3.
Check if all the functions works well during test running. Especially check whether the drainage of
indoor unit is smooth or not.
4.
Press the manual switch button again after finishing the test running . The operating indicator turns
dark and the unit stops operating and is now ready for use.
Manual
control
button
Fig. 25
4
80
AUTO/
COOL
B
A
Test running

Publicidad

loading

Este manual también es adecuado para:

Sc30 serie