Descargar Imprimir esta página

Asco Aseptica Serie Instrucciones De Puesta En Marcha Y Mantenimiento página 4

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 13
5- Adjustment of the new unit
a. Apply electrical power and air pressure.
b. Press middle button no. 12 for more than 3 seconds until
LED 1 (yellow) and LED 4 (orange) flash to automati-
cally start the initialisation procedure (figs. 17 and 19).
c. Release the button and leave the device to automatically
run the initialisation cycle (several openings and closures).
d. After approx. 1 minute, the valve stops in the preset setpoint
position. If there is no setpoint, the valve closes in airtight
position.
e. Put the cover and its seal back in place; be sure to ob-
serve a tightening torque of 5 Nm.
Fig. 17
MAINTENANCE
Prior to any maintenance work or putting into operation,
power off the Positioner
valve to prevent the risk of personal injury or damage
to equipment.
This product complies with the essential requirements
of EMC Directive 2004/108/EC and Low Voltage Directive
2006/95/EC. A Declaration of Conformity is available on
request.
General installation and maintenance instructions
Valves with Positioner
Fig. 18
LED 1
Rep. 12
LED 4
78M05
Fig. 19
, depressurise and vent the
D
- Series Aseptic
D
E S D
CAUTION
OBSERVE
PRECAUTIONS
FOR HANDLING
ELECTROSTATIC
SENSITIVE
DEVICES
4
1
2
2
P
P
(2) (1)
(2) (1)
This product contains electronic
components sensitive to electro-
static discharge. An electrostatic
discharge generated by a person
or object coming in contact with
the electrical components can
damage or destroy the product.
To avoid the risk of electrostatic
discharge, please observe the
handling precautions and recom-
mendations contained in standard
EN 100015-1.
Do not connect or disconnect the
device while it is energised.
GB
3
1
503543-001

Publicidad

loading