epic power ERS 2G Manual De Instalación página 21

Ocultar thumbs Ver también para ERS 2G:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

ERS 2G
Three-phase mains
Braking resistor
VVVF
Motor
The Fig. 10 shows the energy flow when the elevator absorbs energy. The ERS 2G will
automatically detect this situation and it will inject the energy elevator requires, as
shown in Fig. 10.a. If the ERS 2G is not capable to provide all the required energy
(because the energy accumulator is depleted or because it does not reach the
required power), the drive will absorb further energy in a conventional way from the
three-phase mains (Fig. 10.b).
Three-phase mains
Braking resistor
VVVF
Motor
ERS_2G
ERS_P3k
©EpicPower
©epic power
a.
Fig. 9. Regenerative energy flows
ERS_2G
ERS_P3k
©EpicPower
©epic power
a.
Fig. 10. Absorption energy flow
Instalation guide
Three-phase mains
Braking resistor
VVVF
Motor
b.
Three-phase mains
Braking resistor
VVVF
Motor
b.
ERS_2G
ERS_P3k
©EpicPower
©epic power
ERS_2G
ERS_P3k
©EpicPower
©epic power
21

Publicidad

Tabla de contenido
loading

Tabla de contenido