Before Installation - Whale Smartbail BP5012 Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 17
Please ensure all relevant personnel read the points listed below before installation of the pump
and this is passed on to the end user.
Application
The Whale Smartbail bilge pump is designed to pump standing water when installed through the
bulkhead (see fig.1 below). Output capacity depends on installation conditions and pumping rate.
WARNING: Capacity may not be sufficient to cope with a rapid influx of water.
With all applications it is important that a system of safe working practice is applied to installation,
use and maintenance.
If this pump is intended for use for any other purpose outside of the stated guidelines or with any
other liquid, it is the user's responsibility to ensure that the pump is suitable for the intended use,
and in particular, that the materials are fully compatible with the liquids to be used

Before Installation

1.
Ensure that there is enough room behind the bulkhead for full depth of the pump
when installed. This must include space for inlet and outlet hoses. (See Fig. 2 for
maximum dimensions).
2.
Ensure that enough space is available when the pump is installed in order to
operate it with the pump handle fully open. (See fig.3 for recommended
mounting positions).
Skin Fitting
Combined
head and
lift less than
3m
Outside Boat
Bulkhead
Smartbail
Strum boxes
Top entry - SB5865
Side entry - SB4222
Fig.2 Maximum
.
Fig.1 Typical
Installation
Dimensions

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Smartbail bp5010bSmartbail bp5021b

Tabla de contenido