Installation
Appliance description
8.2
Assembly
The following conditions have been prepared for the appliance
at the factory:
- Power supply from "below", installation on unfinished walls
- Water connection, installation on unfinished walls
The appliance must be fitted vertically, over or undersink, to a
solid wall.
8.3
Temperature limit/Anti-scalding protection
The maximum temperature can be limited to 43 °C via the user
interface on the appliance cap. For this, the following steps are
necessary:
Remove the appliance cover.
Remove the electronic PCB from the user interface on the ap-
pliance cap. Be careful of the snap-on hooks.
Move the plug from left to right (position "43 °C").
Refit the user interface, ensuring the snap-on hooks click into
place. Observe the positions of the pushbutton and shaft.
CAUTION Burns
If operating with preheated water, the set temperature
limit and anti-scalding protection may be ineffective.
In this case, restrict the temperature at the upstream
central thermostatic valve; see chapter "Accessories".
8.4
Installation versions
The following installation versions are possible/permissible:
- Power supply for unfinished walls - from above
- Power supply for finished walls
- Water installation for finished walls
- Installation with repositioned appliance cap
- Installation for offset tiles
- Installation of a load shedding relay
22
| DHB-E SLi | A electronic
8.5
Accessories
Taps/valves
- WKMD – twin-lever pressure-tested kitchen tap
- WBMD – twin-lever pressure-tested bath tap
Plug G ½ A
These plugs are required if you use twin-lever pressure-tested
taps for finished walls other than the ones recommended by us.
Installation sets for installation on finished walls
- Solder fitting – copper pipe for solder connection Ø 12 mm.
- Compression fitting – copper pipe.
- Compression fitting – plastic pipe: Sanfix-Plus or
Sanfix-Fosta).
Universal mounting frame
- Mounting frame with electrical wiring.
Pipe assembly for undersink appliances
The set for undersink installation is required if you want to have
the water connections (G ⅜ A) above the appliance.
Pipe assembly, offset installation
This pipe set with pipe bends is required if you want to have the
appliance vertically offset against the water connection by approx.
90 mm downwards.
Pipe assembly for replacing a gas water heater
This pipe set is required if the installation has existing gas water
heater connections (cold water connection on the left and DHW
connection on the right).
DHB replacement pipe kit
2 water couplings. These allow the appliance to be connected to
the available water plug-in connections of a DHB.
Load shedding relay LR 1-A
The load shedding relay for installation in the electric distribution
board enables priority control of the instantaneous water heater
when electric storage heaters are being operated simultaneously,
for example.
ZTA 3/4 – Central thermostatic valve
Thermostatic valve for centralised premixing, e.g. an instanta-
neous water heater in conjunction with a solar thermal system.
www.stiebel-eltron.com