Health O Meter 600KL Instrucciones Para El Usuario página 8

Ocultar thumbs Ver también para 600KL:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

ASSEMBLY INSTRUCTIONS (CONT.)
4. Plug the load cell cable connector into the
load cell plug in the platform base. The
base of the scale has been designed to
provide wire management for the load cell
cable. Route the load cell cable as shown.
5. After plugging in the load cell cable, slide
the section of plastic tubing surrounding the
cable upwards.
6. Tuck the cable and tubing into the
protective guide in the underside of the
scale platform. This holds the cable in place
and protects it from being damaged.
P/N UM600KL_600KG_Rev20190416_Web
plastic tubing
tuck into
protective
guide
8
Load cell cable port

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

600kg

Tabla de contenido