Establishing The Electrical Connection - Binzel Abicor BRS-LC Instructivo De Servicio

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

BRS-LC

6.8 Establishing the electrical connection

NOTICE
• The torch cleaning station must remain depressurised and tension-free during setup!
• The gas nozzle diameter must match the one of the prism.
• The distance sleeve must match the nominal diameter of the gas nozzle.
• The milling tool must be adapted exactly to the torch type.
1 Loosen the lateral mounting screws and remove the covering hood.
2 Guide the connecting cable through the PG 9 screw joint to the terminal block.
3 Terminal assignment: Operating voltage 24 VDC to X1.7, GND to X1.5.
4 Control signal input for "lift" (stroke movement) to X1.10.
5 Connect the control signal output for "ready" (stroke down, clamping cylinder open) to X1.12
Input / Ready
Output / Lift
Output
Clamping / motor
24VDC
GND
Fig. 10
Wiring scheme
6 Putting into operation
Signals
Clamping cylinder
open
Stroke down
Valves
Stroke
Clamping / motor
XPE1
EN - 15

Publicidad

Tabla de contenido
loading

Tabla de contenido