®
LUX-top
G-T
– shear connector (installation optional)
a)
After the guardrail has been fully
assembled, divide the guardrail
sections
into
individual lengths
b)
Cut the guardrail tube in the
relevant section after approx.
1/3 of the section/span distance
using pipe cutters or a metal
saw and deburr if necessary
c)
Push on LUX-top
connector and fix in the middle
over the joint by means of the
wing screws (middle alignment
achieved using the middle hole)
User instruction:
To foldaway/collapse the system, undo the wing screws of the LUX-top
push the shear connector to the side and fix there using the wing screws to prevent sliding.
ST QUADRAT Fall Protection S.A. – Your competent partner for fall protection solutions – www.lux-top-absturzsicherungen.de
the
required
®
G-T shear
Page 26 Version 05/2019
®
G-T shear connector,