Commissioning
4.1
Commissioning
Note
Refer to [Programming the Transmitter] (Page 26) if needed.
1. Scroll down to [Install Xdcr] and press <Right Arrow>.
2. Scroll down to [Install Complete]. Press the <Right Arrow> and select [Install]. Press
3. Observe the Measured Vs window and verify a correct sound velocity measurement (if
4. Press the <Down Arrow> to accept sound velocity value.
FUS1010 IP65 NEMA 4X
Operating Instructions, 7/2010, A5E03086486-02
<ENT>. The flowmeter will go through its drives.
Figure 4-1
Final Setup
Figure 4-2
Measuring Flow
known).
4
39