Installing Inner Channel and Routing Cables
Note: Be certain holes on inner channel (C) face in
3
the same direction of opening on outer channel (B).
Note: Cables must be removed from display
before routing through channels. If cables are not
removable from display, routing through channels is
not an option.
Guide display cables into openings in channels then
insert inner channel (C) into outer channel (B) as
shown in figure 3.1.
Position inner channel (C) to the desired height and
secure using two M6 x 12 mm socket pin
screws (L) through clamp plate (D), through opening
in outer channel (B) and into inner channel (C) as
shown in figure 3.2.
Insert swivel/pivot bracket (E) into end of inner channel (C) and secure with four M5 x 10 mm socket pin screws (J)
4
as shown in figure 4.1 and figure 4.2.
Thread two M5 x 10 mm screws (J) into top holes of swivel/pivot bracket (E), leaving 1/8" (3 mm) exposed thread
between head of screw and swivel/pivot bracket as shown in figure 4.3.
fig. 4.1
C
E
OP ENIN G
HOLES
CABLES NOT SHOWN FOR CLARITY
fig. 4.2
E
7 of 35
fig. 3.1
B
GUIDE
CABLES IN
C
CHANNELS
fig. 4.3
J
C
J
1/8"
(3 mm)
ISSUED: 11-29-07 SHEET #: 202-9263-3 04-25-14
fig. 3.2
L
D
B
C
E
E
J
1/8"
(3 mm)
FRONT VIEW