KOBE CH-77 Serie Instrucciones De Instalación Y Manual De Operación página 13

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Hood Installation
CAUTION: If required to move the cooking range to install the hood, turn off the power on an
electric range at the main electrical box. SHUT OFF THE GAS BEFORE MOVING A GAS
RANGE.
1.
Puncture the knockout holes on the hood as shown in Figure 10.
2.
Unscrew and remove the multi duct exhaust. Replace with {F} vent cover (top) on page
3. Refer to Figure 11.
3.
Remove the baffle filters and spacers. If necessary, arrange the electrical wires to run
through the 1" diameter hole on the top or the rear of the hood. Refer to Figure 12.
4.
Using references on Table 1 and measurements on page 20 center the hood in place
beneath the cabinet and flush with the front of the cabinet.
5.
Place screw (not provided) into the exact center of each knockout hole. Make sure all
screws are in place before tightening screws. CAUTION: MAKE SURE THE HOOD IS
SECURE BEFORE RELEASING.
Ductwork Installation
6.
Use aluminum or steel pipe to connect the exhaust opening at the rear of the hood to the
ductwork. Use duct tape to make all joints secure and air tight.
7.
Continued at "Wiring to Power Supply" on page 16.
Figure 10
1" Diameter Hole
Figure 12
11
Figure 11

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Ch7730sqbCh7736sqb

Tabla de contenido