KOBE CH-77 Serie Instrucciones De Instalación Y Manual De Operación página 17

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

***This installation only applied with the purchase of a duct cover (Model No. CH1120DC).
Preparation before Installation
NOTE: TO AVOID DAMAGE TO YOUR HOOD, PREVENT DEBRIS FROM ENTERING THE
VENT OPENING.
- Decide the location of the venting pipe from the hood to the outside. Refer to Figure 21.
- A straight, short venting run will allow the hood to perform more efficiently.
- Try to avoid as many transitions, elbows, and long run as possible. This may reduce
the performance of the hood.
- Use duct tape to seal the joints between pipe sections.
- If necessary, prepare back wall frame with cross framing lumber for secure installation.
Using references on Table 2 and measurements on page 20-21, decide the level of the
lumber. Refer to Figure 22.
Hood Preparation before Installation
- Temporarily wire the hood to test for proper operation before installing.
- Peel protective film off the hood and the duct cover (if any).
- Remove the screws on the vent cover (rear) and cut along the line of the inner vent
cover (rear) opening. Refer to Figure 23.
- Cut the vent cover (rear) opening and reverse to the other side. Refer to Figure 24.
WALL MOUNT INSTALLATION – REAR VENT
Figure 21
Figure 23
Inner Vent
Cover (Rear)
15
Figure 22
Reversed
Vent Cover
(Rear)
Figure 24

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Ch7730sqbCh7736sqb

Tabla de contenido