Kohler K-408 Manual Del Usuario página 4

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Main Valve Bodies
Diverter Valve
1. Component Layout
Verify the location of the components and the orientation of all
ports.
Determine the location and orientation of the transfer valve. The
location of the bath spout, handshower, and the optional auxiliary
shower will affect the piping and connectors needed.
Allow clearance for valve outlets, handles, bath spout, and
handshower hoses.
2. Preparation
Provide an access panel for all installations.
Allow for access to the connection between the handshower and
the handshower decorative base.
For easiest installation, do not install the bath unit until all
soldering (except supplies) is complete. Then install the bath and
connect the supplies.
Install the bath spout according to the spout installation
instructions. If possible, do not install the finished trim until all
other installations and construction are completed.
Install the main valve bodies upstream from the diverter valve
according to the valve body installation instructions.
Loosely secure the valve bodies.
086847-2-AC
Auxiliary Shower
Hose Connection
Braided Hose
4
Decorative Hose
Kohler Co.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

K-409

Tabla de contenido