13
Vertical Track
IMPORTANT: THE TOPS OF THE
Tools Needed:
FLAGANGLE
VERTICAL TRACKS MUST BE LEVEL
3/16" Drill Bit
5/16 X 1-5/8"
FROM SIDE TO SIDE. IF THE BOTTOM
LAG SCREWS
SECTION WAS SHIMMED TO LEVEL IT.
Power Drill
THE VERTICAL TRACK ON THE SHIMMED
SIDE, MUST BE RAISED THE HEIGHT OF
7/16" Socket
THE SHIM.
Driver
VERTICAL
TRACK
Tape Measure
Position the left hand vertical track
ASSEMBLY
assembly over the rollers of the bottom
Level
section. Make sure the counterbalance
cable is located between the rollers and
BOTTOM SECTION
the door jamb. Drill 3/16" pilot holes for
the lag screws.
Install the track so that it is aligned with
the bottom of the door.
JAMB
Secure jamb brackets and fl agangles
BRACKET
to the jamb using 5/16 x 1-5/8" lag
screws. Hang counterbalance cable over
fl agangle. Repeat for the right side.
VERTICAL TRACK
5/8"
BOTTOM SECTION
ROLLER
LAG
SCREW
LOCATIONS
FULLY ADJUSTABLE FLAGANGLE
JAMB BRACKET
5/16" X 1-5/8"
LAG SCREW
21
Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer, refer to your
local yellow pages/business listings or go to the Find a Dealer section online at www.wayne-dalton.com