Husky 32220 Instrucciones De Instalación página 11

Ocultar thumbs Ver también para 32220:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

From Towing Position to Maneuver Position:
1.Be sure truck and trailer are on level ground and in a straight line.
2. Pull the handle #7 out and rotate forward so that the latching pins are in hole #3 (rear hole).
3. Apply a tug test. This consists of applying the trailer brakes and slowly driving the truck forward until the
Husky Roller moves rearward and the latch pins fully engage in hole #4 in both roller tubes.
4.Check both latch pins for full engagement.
Front of Truck
From Maneuver Position to Towing Position:
1.Be sure truck and trailer are on level ground and in a straight line.
2. Pull the handle #7 out and rotate rearward so that the latching pins are in hole #2 (front hole).
3. Apply a tug test. This consists of applying the trailer brakes and slowly driving the truck rearward until
the Husky Roller moves forward and the latch pins fully engage in hole #7 in both roller tubes.
4.Check both latch pins for full engagement.
Front of Truck
All Products limited to Vehicle Tow Rating; see Vehicle Owners Manual. See
for Warranty Information / Tech Support ©2014 Husky Towing Products Revision: June 03, 2014-REV 4
OPERATING INSTRUCTIONS
Hole 7
Page 11 of 42
Hole 4
www.huskytow.com

Publicidad

Tabla de contenido
loading

Tabla de contenido