Installation Instructions - EdilKamin IRIS UP Instalación Uso Y Mantenimiento

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 38
COVERINGS
Model with ceramic side covering.
Covering parts list:
• side (11) n° 4 pz
• front/rear bar (10-12) n° 4 pz
• cast iron top (15)
• cast iron pellet cover (16)
• ceramic insert (14) n° 2 pz
• cast iron base (2)
After positioning the frame according to the
instructions shown in the

INSTALLATION INSTRUCTIONS

chapter, proceed as follows in the order shown:
• Remove the cast iron top (15) by loosening the 4
screws (x) beneath the cover of the pellet hopper
(16) and the 2 screws on the back part (y).
• Insert the 4 ceramic lateral sides from the top (11)
into the housing of the aluminium lateral profiles
(10-12)
• Put the top back into place and fasten it
• Apply as much tape as is necessary into the cera-
mic insert housing (14) on the top (refer to fig. A).
• Place the upper ceramic insert (14) into the centre
for it to fit into the two housings and secure it into
place by pressing it lightly in order for it to bond
with the tape.
• Apply as much tape as is necessary onto the little
tooth of the lower cast iron front panel (refer to fig.
B).
• Place the lower ceramic insert (14) into the centre
onto the little tooth and secure it into place by pres-
sing it lightly in order for it to bond with the tape.
14
12
2
14
16
15
60
11
11
11
11
(fig. A)
(fig. B)
- 18
-
11
94
11
10
12
10
49
16
15
14
y
y
x
x
x
x
14
14

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Iris

Tabla de contenido