Descargar Imprimir esta página

Heathrow Scientific Vortexer Manual De Instrucciones página 9

Ocultar thumbs Ver también para Vortexer:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

E. Loading of 5 mL tubes
(maximum of 2)
F. Loading of 1.5/2 mL tubes
(maximum of 4)
G. Loading of .5 mL tubes
(maximum of 6)
H. Loading of .2 mL tubes
(2 tube strips - maximum of 24)
Vortexer head removal
In the event of a cleaning being needed for
the Vortexer, please follow the sequence of
removal for the mixing head.
Turn the power OFF by placing the 3-position
switch into the OFF (center) position.
Grasp the installed mixing head attachment
with two hands and pull straight up until it
releases from the shaft. A technique of lifting
the attachment with your fingertips while using
your knuckles as a fulcrum will give you the
leverage to remove the installed attachment
component smoothly. Once Vortexer is cleaned,
reinstall the mixing head per instructions.
e
f
g
h
Place
switch in
the OFF
position
Pull
straight
up
9

Publicidad

loading

Este manual también es adecuado para:

Hs120209Hs120210Hs120212Hs120214Hs120318