INGEREV SMART DLM
4 Wattmeter
The SMART DLM kit contains an external A65 or A65+ wattmeter, supplied by Ingeteam.
A65: wattmeter used in installations with a consumption of under 65 A per phase.
A65+: used in three phase installations with a consumption of more than 65 A.in
any of the phases (current transformers are required).
Through an RS-485 serial communication between the INGEREV charging point and the wattmeter,
the charging point obtains the wattmeter readings in order to automatically adjust the maximum
available power for recharging electric vehicles at the installation.
4.1 Installation
The wattmeter must be installed on a DIN rail.
4.2 Connection
All connections must be made with the power disconnected.
The connection varies, depending on the wattmeter model installed, either A65 or A65+.
ABW2012IQM01_.docx
Ingeteam
EN
ES
FR
IT
7