Complete Installation on Rough Deck (cont.)
Pivot the valve bodies enough to remove the tee and two pieces of
tubing. If the valve body holes are smaller than recommended, it
may be necessary to remove the entire valve body assembly.
Install the tubing into the tee. Match the copper tube from the tee
with the spout supply tube.
Pivot the valve bodies onto the two pieces of copper tubing.
Do not solder at this time.
Reset Valve Body Height
Adjust the threaded collars until the dimension from the top of the
sleeve to the top of the rough deck equals the clearance requirement
calculated earlier.
Solder Connections
Tighten the mounting nuts on each valve body under the deck.
Solder the copper tubes to the valve bodies, tee and spout supply
tube.
Ensure that the cold supply is on the right side.
Solder the hot and cold water supply tubes to the valve body inlets.
1017937-2-A
10
Kohler Co.