Ducting Setup - Dri-Eaz DriTec 4000i El Manual Del Propietario

Ocultar thumbs Ver también para DriTec 4000i:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

NOTICE: Connect to two separate 15A circuits ONLY. A
bright green light on the front of the unit indicates correct
connections. No light will show when using only one cord
or if both power cords are plugged into the same power
circuit.
For best performance, use with two circuits and en-
sure green light is illuminated. If a second circuit is
not available, the unit may be operated on a single
power cord. Plug into Circuit 1. Note that the unit will
operate at 50% of the rated performance when using
a single power cord.
Startup display and normal display modes
When unit is first plugged in to AC power, the control
panel display will briefly cycle through a series of
readouts. This is part of the unit's self-diagnosis proce-
dure and no user intervention is required.

Ducting Setup

NOTICE! For indoor use only. Do not expose the unit
to rain or snow. If electrical components become
wet, allow the unit to dry thoroughly before operat-
ing.
1. Reactivation Outlet Ducting
Use the duct clamp provided to attach the ducting to the
duct ring. The reactivation air should always be ducted
to the outside.
Fig. B: Initial Setup
1. React outlet duct
ring. MUST BE IN-
STALLED
49-109J F533
NOTICE
Condensation may collect in the reactivation duct during opera-
tion. Do not allow water to run back into the unit. This could cause
a shock hazard or damage to the unit.
NOTICE: Temperatures inside React Out ducting can
reach 150°F (66°C). Use only heat-rated ducting as
provided.
Process Outlet Ducting
The process out air may be ducted where more focused
drying is required. Use with layflat ducting only.
Maximum Ducting Length
To ensure maximum performance, do not exceed these
ducting lengths:
For more ducting options, see Fig. C.
Process air
outlet grille
Square wire
ducting frame
2. Process air in
duct (optional)
3
Reactivation air
20 ft.
Process air
10 ft.
Inlet air
30 ft.
1. Install 4 standoff
screws as shown.
3. Place wire frame inside offset screws and
click into place. When not in use, frame may be
left in standoffs or placed in storage bin.
6 m
|
3 m
|
9.1 m
|
2. Tuck layflat
ducting (pur-
chased sepa-
rately) through
square wire frame
and fold back out-
side the frame.
Legend Brands, Inc.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Dritec f533Disecante dritec 4000iF533

Tabla de contenido