Countersunk
Holes
2" Stainless Steel
Flathead Screw
Footbath
Locating Pin
11. Install the Wall Jambs
IMPORTANT! Leave the studs exposed. The wall jambs must be secured directly to the stud wall frame
to achieve proper support of the enclosure. Expanding wall anchors do not provide adequate support for
the door. Do not install the finished wall until instructed to do so.
NOTE: The enclosure components are identified with removable labels to assist you with component
identification.
Remove the wall jamb kit from the carton and locate the wall jambs. Leave the protective tape in
place.
Install one of the wall jambs by positioning it over the footbath locating pin. The two countersunk
holes must be on the inside top. The wall jambs are not interchangeable.
Use a level and adjust the wall jamb to be exactly plumb. Secure the wall jamb to the double stud
framing and furring strips with four 2" (5cm) stainless steel flathead screws (provided).
Repeat for the other wall jamb.
12. Apply Silicone Sealant
CAUTION: Risk of concealed leakage. Apply silicone sealant, following the sealant manufacturer's
instructions, to ensure a watertight installation.
Apply a continuous bead of silicone sealant to the inside of the wall jamb where it contacts the
footbath, as shown.
Repeat for the other wall jamb.
1032108-2-A
Wall
Jamb
Level
Silicone
Sealant
12
TOP VIEW
INSIDE OF
WALL JAMB
Kohler Co.