Base And Acrylic Wall Installation (Optional) - Jacuzzi SAVANNAH-GP Instrucciones De Asamblea

Ocultar thumbs Ver también para SAVANNAH-GP:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

BASE AND ACRYLIC WALL INSTALLATION (OPTIONAL)

Notes:
• Do not install acrylic shower panels directly against tiled walls.
• Install the acrylic shower panels against water resistant gyproc or cement walls.
• Before assembling permanently the panels, apply the silicone sealant on the internal edges.
1-2. Place the acrylic panels (Z1 & Z2) together, drill the 2 panels, secure with the screws (EE).
Notes: It is recommended that a small diameter bit be used when first drilling acrylic panels to
avoid cracking them. Begin with the smaller bit and gradually move to larger drill bits until the
3. Place the panels onto the edges of the base and make sure they are leveled before going to the
next step.
4-5. Carefully measure and trace the exact location of the plumbing access on the panels. Remove
the panels from the base, double check your measurements and then drill holes in the panel that will
accommodate the shower head and the shower handles.
ø1/8"
3mm
Z1
1
Z1
EE
3
proper sized hole is attained.
2
9
Studs
Drywall
4
Acrylic Wall
Silicone
Shower Base
5

Publicidad

Tabla de contenido
loading

Tabla de contenido